# Your customer target needs 10 more reserved appointment-hours

**Synthetic demonstration, not a forecast.** Recalculated with v0.1.1 on 2026-10-09; this example explicitly confirms no sales delay. To end this month with 110 recurring customers, this scenario requires **200 leads, 100 booked appointments and 50 sales hours**. Only 40 usable hours are available. Resolve the **10-hour scheduling gap**, or use the capacity-constrained scenario of **160 leads and an expected ending base of 106 customers**. Do not buy the larger lead volume on the assumption that no-shows free scheduled slots.

The numerical review is complete for the supplied one-month scenario. The requested target is not supported by declared sales capacity. No campaign, staffing or customer action was taken.

## What the owner supplied

All figures are deliberately fictional and authorized for this demonstration, not benchmark recommendations. An active customer has a recurring service agreement. Opening customers:100; desired end:110; monthly churn:10% of the opening base. The chosen calendar is constant monthly acquisition over one month. New customers join at month end; there is no sales delay or same-month churn on those joins.

The same-month funnel is: 50% of leads book; 80% of bookings attend; 25% of attendees become recurring. Trial is not a separate stage in this fictional business. Another business must include it if applicable. Each reserved sales appointment uses 30 minutes, including no-shows. Forty usable monthly sales hours remain after other duties; onboarding and ongoing fulfillment are separately covered in this example and do not draw on these 40 hours. This assumption must be verified for a real business.

## Customers and funnel

| Step | Fractional expectation required | Operational whole-count requirement |
|---|---:|---:|
| Opening recurring customers |100|100|
| Expected churn loss |10|Not a promise of exactly 10 cancellations|
| Growth above opening |10|Scenario goal|
| New recurring customers |20|20|
| Attended meetings |80|80|
| Booked appointments |100|100|
| Leads |200|200|

Customer conservation: **100 − 10 + 20 = 110**. Reverse conversion divides by each adjacent rate and rounds upward at each stage. These particular inputs divide evenly; other cases may have fractional expected counts and higher operational requirements. The helper recalculates forward expectations from the integer leads to expose any rounding overshoot.

## Capacity and a smaller feasible scenario

| Measure | Requested acquisition plan | Capacity-constrained scenario |
|---|---:|---:|
| Leads |200|160|
| Bookings |100|80|
| Expected attendees |80|64|
| Expected new recurring customers |20|16|
| Reserved sales hours |50|40|
| Available sales hours |40|40|
| Hour shortage |10|0|
| Expected ending customers |110|106|

The lower scenario fits the declared resource while missing the desired ending target by four expected customers. It does not improve conversion rates or assume extra hires. It has no guarantee of actual attendance or sales. Before adopting either option, confirm whether another 10 usable hours can really be allocated without weakening ongoing service; otherwise discuss a revised target or acquisition calendar.

## Optional spend

The illustrative cost is 10 USD per lead, applied to all leads in this channel: **2,000 USD** for the requested volume or **1,600 USD** for the constrained volume. This is acquisition spend only, excluding salaries, delivery expenses and other business costs. It is not profit, return on ads or a provider quote.

## Source-method review

| Step | Applied evidence | Result | Adaptation/limit |
|---|---|---|---|
| M1 Goal/churn,06:29 | Stated recurring definition,100→110,one month,10% opening-base churn |Fulfilled|Monthly timing is our declared convention|
| M2 Replacement/growth,09:44 | 10 lost +10 growth =20 new; conservation shown |Fulfilled|Month-end joining, no delay|
| M3 Reverse funnel,11:14 | 20 recurring→80 attended→100 booked→200 leads; integer and expected counts |Fulfilled|Funnel supplied by synthetic case; no video defaults|
| M4 Optional cost,13:10 | 200×10 and160×10 USD |Fulfilled|Acquisition-only estimate, not profit|
| M5 Time/capacity,15:48 |100×0.5=50 hours versus40; constrained80 slots |Fulfilled|Reserved slots include no-shows; other duties explicitly covered separately|

This is the developer's manual review of a synthetic execution, not independent buyer acceptance. Numerical outputs are retained in result.json; the input includes every rate's denominator, period and basis. run-notes.md records execution and limits. The source inspired the sequence; recurrence, rounding, capacity algorithm and output handling are our engineering additions.
